Full Electrical Retrofit Elite Lifter 1 Crane

PT Dok Warisan Pertama (PaxOcean) • 2024
Full retrofit and upgrade 3 unit of the old crane system with the new crane system. Change all the old wiring and parts. Combine both LMI and AML system into the PLC/HMI system with additional custom safety limit. Also include the full document preparation due to old document no longer exist.

Gallery

Need help?